Observatory and Automation

Observatory Renovation: The Work Begins!

Observatory Upgrade: Making Room for Something New!

Alright, mystery alert! Something big is brewing at the observatory, and that means it’s time to make some space! I just spent two days completely overhauling the “control room,” stripping it down to the bare essentials, re-doing the wiring, and getting ready to add some new components. As they say, a picture is worth a thousand words, so let’s dive into the photos…

Tearing Down the Partition Wall: IMG-20160204-WA0011.jpg IMG-20160204-WA0013.jpg

Building a New Desk: IMG-20160204-WA0015.jpg IMG-20160204-WA0021.jpg

New 16-Port Gigabit Switch: IMG-20160204-WA0028.jpg

New Flat Panel: IMG-20160205-WA0006.jpg

Yep, that’s a lot of wood… : IMG-20160204-WA0034.jpg

A Few Overview Shots After Finishing Touches: IMG-20160205-WA0018.jpg IMG-20160205-WA0020.jpg

New Telescope Shelves: IMG-20160205-WA0014.jpg

New Decor and IP Cameras (3 Total!): IMG-20160205-WA0016.jpg

Adding an X880 Module for 8 More I/O to the IPX880 V3: IMG-20160205-WA0010.jpg

UPDATE 02/15/2016: Another weekend of work, and the new pier is rising from the ground… The mystery continues!

Removing the Floorboards: IMG-20160213-WA0007.jpg

Cutting the Floor Support: IMG-20160213-WA0009.jpg

Digging the Foundation Hole: IMG-20160213-WA0013.jpg

Installing the First Pier Section: IMG-20160213-WA0017.jpg

Filling with Concrete, Inside and Out: IMG-20160213-WA0019.jpg IMG-20160213-WA0023.jpg

Adding the Second Pier Section: IMG-20160214-WA0010.jpg

Reinforcing the Under-Floor Structure: IMG-20160214-WA0000.jpg

Prepping and Cutting the Floor: IMG-20160214-WA0004.jpg IMG-20160214-WA0006.jpg

Re-installing the Floorboards: IMG-20160214-WA0012.jpg

Installing the Third Pier Section, Filling with Concrete, and a 3cm Mortar Finish on Top: IMG-20160214-WA0016.jpg

Almost Done: IMG-20160214-WA0018.jpg

Prepping for Wood Paneling: IMG-20160214-WA0028.jpg